The HAZOP method uses guide words across sectors, but the study boundary, process information and questions must fit the facility being reviewed.

Updated: 3 November 2026. This revision removes unsupported facility claims, sector rankings, schedules and cost bands. HAZOP uses a structured guide-word method, but the useful study questions depend on the process, operating mode, hazards, interfaces and available information. Do not copy a sector template or assume one HAZOP covers every risk. Define the study objective, then select nodes and technical participants that match the system under review. (IEC 61882:2016)
The examples below are prompts for planning only. They do not describe a specific site, establish that a safeguard exists, or replace a facility risk assessment.

What should a HAZOP cover in different sectors?

Sector or process Example questions for scoping Information the team may need
Chemical or batch manufacturing What if an addition is late, incomplete or made in the wrong sequence? What utilities affect heat removal, containment or safe transfer? Process description, design basis, batch sequence, reaction and materials data, P&IDs, control narratives and operating procedures.
Oil, gas, terminals or fuel transfer What if transfer stops, reverses or exceeds the intended rate? What changes during loading, unloading, start-up or shutdown? Transfer procedures, process and utility drawings, equipment limits, inventory and interface information, and relevant operating modes.
Mining and mineral processing What if reagent concentration, slurry flow, water supply or process sequence departs from intent? Which upstream or downstream systems can be affected? Process-flow information, reagent handling and compatibility details, control and utility drawings, operating procedures and interface boundaries.
Food, beverage or cold storage What if refrigeration capacity, temperature control, cleaning-chemical transfer or utility supply changes? Which process-safety and product-quality questions need separate methods? Refrigeration schematics, chemical handling information, operating and cleaning procedures, alarm/trip descriptions and relevant quality-system boundaries.
The table does not rank sector risk or prescribe safeguards. A cold-storage HAZOP, for example, must reflect the actual refrigerant, system design, occupancy and operating arrangements. A mining process HAZOP does not, by itself, assess tailings-facility stability. Select a method suited to each hazard and decision.

How do you tailor a HAZOP to a facility?

  1. Write the question the study must answer. Define the process, change, operating modes and decisions in scope.
  2. Set study boundaries. Identify relevant equipment, procedures, utilities, interfaces and exclusions.
  3. Select current information. Record drawing and procedure revisions; list gaps rather than treating them as verified facts.
  4. Invite relevant knowledge. Include people who can explain design intent, operations, maintenance, controls and safety issues within the chosen scope.
  5. Agree the method and record. Define guide words, any risk-ranking procedure, action ownership and follow-up before the workshop starts.
    The full HAZOP guide-word method includes preparation, examination sessions, records and follow-up. Use the guide-word reference to see how a parameter and guide word form a deviation, and the worked illustrative example to see one hypothetical worksheet row.

Is HAZOP the only risk method a facility needs?

No. A HAZOP is one structured hazard-identification method. Some decisions need additional analysis, such as consequence modelling, LOPA, QRA, task risk assessment, machinery assessment or a specialist structural review. The study scope should explain what the HAZOP covers and what it leaves to another method.
For a South African MHI, Regulation 10 requires the duty holder to ensure an approved inspection authority carries out the establishment risk assessment in accordance with SANS 1461 at intervals not exceeding five years or when the establishment changes. This requirement applies to MHI risk assessments; it does not make the industry examples in this article a substitute for that assessment. Confirm the scope with the responsible AIA. (Major Hazard Installation Regulations, 2022, reg. 10)

What affects HAZOP time and cost?

There is no verified sector-wide rate or schedule in this article. Effort depends on the scope, process complexity, study boundaries, drawing quality, operating modes, preparation, team availability, facilitation, reporting and action follow-up. Compare written proposals by their deliverables and assumptions, not by a day rate alone. See HAZOP study cost in South Africa for quote factors.

Frequently asked questions

Is the HAZOP method different for each industry?

The guide-word method is structured, but study boundaries, relevant parameters, scenarios, information and team knowledge depend on the process. The terms of reference should state how the method will be applied.

Can a generic industry checklist replace the study team?

No. A checklist can prompt discussion, but the team must test deviations against the actual design intent, operating information, safeguards and site conditions.

Does a HAZOP assess every risk at a mine or refinery?

No. The study covers its defined system and method. Some topics require separate methods and competent specialists; document exclusions and interfaces so readers understand the limits.

How do I estimate the study duration?

Ask providers to state the assumed scope, information needed, workshop days, preparation, report contents and follow-up. No single duration applies across sectors or facilities.