AI Quick Summary

Build a HAZOP team around the process and study boundary. Include people who can explain design intent, operation and relevant safeguards; there is no universal team size for every study.

Build a HAZOP team around the process, study boundary and questions the study must answer. Include people who understand the design intent and normal operation, plus relevant discipline specialists who can explain equipment and safeguards. There is no universal team size or mandatory list of professional titles for every HAZOP. The UK Health and Safety Executive's overview describes a team method that examines deviations from design intent and involves relevant people; it is method guidance, not a South African rule on team composition.
Updated, 3 November 2026: Removed fixed team-size recommendations, universal role and credential requirements, arbitrary experience thresholds and unsupported industry-specific rosters.

Which roles may need to participate?

Perspective Contribution to consider
Facilitator Guides the agreed method, maintains scope and manages the discussion.
Design or process engineer Explains design intent, process conditions and relevant design documents.
Operations Explains actual operating modes, procedures, limits and practical constraints.
Maintenance or reliability Explains maintenance practices, equipment condition and relevant failure history.
Instrumentation and control Explains control functions, alarms, interlocks and available instrument information.
Other specialists Join when the process or hazard requires specific knowledge, such as materials, utilities, fire protection or environmental controls.
Recorder Captures deviations, decisions, assumptions and actions; this task may be separate or combined if agreed and feasible.
This is a menu of perspectives, not a required staffing template. One person may cover more than one discipline if their knowledge fits the task. Add other roles when they can answer a question that matters to the study.

How many people should attend?

Choose a group small enough for a focused discussion and broad enough to cover the necessary knowledge. A large study may use different teams for separate process areas, but the study plan should preserve relevant interfaces and identify how findings will be connected. A small team can miss a viewpoint if important operating, maintenance or control knowledge is absent. Set the size from the scope and people needed, not from a generic head-count rule.

How should the team be selected?

  1. Define the boundary. Identify the process areas, design stage or change the study covers.
  2. List the questions. Note the design, operation and safeguards the team must explain.
  3. Map expertise to questions. Invite people with relevant knowledge of the process and the conditions being reviewed.
  4. Check time and preparation. Confirm participants can review the reference documents and attend the required sessions.
  5. Plan how to handle gaps. Identify who can answer unresolved questions and how actions, assumptions and decisions will be recorded.
    The facilitator should make space for each relevant discipline and distinguish verified safeguards from assumptions. A role title alone does not establish whether a participant has the needed process knowledge.

What should participants prepare?

Agree the required reference documents before the sessions. These may include drawings, process descriptions, operating procedures, relevant change information and prior action records. The exact input list depends on the study scope. Ask the facilitator to identify missing information early and state how it affects the study.
During the workshop, participants should explain what they know, question assumptions and flag where the available information is incomplete. Afterward, the facility should review the record for factual accuracy, assign actions to owners and decide how to track them. Those activities should be agreed in the project scope; this article does not prescribe one report template.

HAZOP team and MHI assessment are different scopes

A HAZOP may contribute to process hazard review. For an MHI risk assessment, regulation 10 of South Africa's Major Hazard Installation Regulations, 2022 requires an approved inspection authority to carry out the assessment in accordance with SANS 1461. Confirm the AIA and assessment scope separately; participation in a HAZOP does not itself confer that approval.
MMRisk lists HAZOP and HAZID facilitation and an Advanced HAZOP training course. Ask the facilitator to explain who should attend your study based on its scope and process. Contact MMRisk to discuss a proposal.

Frequently asked questions

Is a HAZOP team size set by law?

This guide does not identify a general legal head-count rule. Determine the participants from the study boundary and the knowledge needed. Check any specific standard or regulatory condition that applies to your work.

Does every HAZOP need a separate recorder?

Not necessarily. The study plan should identify who will capture findings and actions. Whether recording is a separate role depends on the group, workload and deliverable.

Must the facilitator be a Professional Engineer?

This guide does not establish a universal professional-registration requirement for every facilitator. Check requirements for the specific work and evaluate relevant method, process and facilitation competence.

Should operations staff participate?

Include operations knowledge when it is needed to explain how the process is run, including relevant operating modes and practical constraints. The team should fit the study rather than rely on a fixed role list.