Define the assignment, verify any required approval, and compare consulting proposals by team, scope, evidence, deliverables and limitations.
Choose a process-safety consultant by matching the provider's verified competence and scope to the work your facility needs. For an MHI risk assessment, South Africa's regulation 10 requires an approved inspection authority (AIA) assessment in accordance with SANS 1461. A HAZOP, training course or general process-safety review is a different assignment and does not itself replace that legal requirement. Start with the 2022 Major Hazard Installation Regulations and define the decision the work must support.
Updated, 3 November 2026: Removed unverified AIA-number, project-volume, credential, pricing, client-retention and performance claims. Added current regulator and professional-verification links and separated MHI risk assessment from other consulting work.
1. Define the assignment
Write a short scope before asking for proposals. State the facility, process or change, the decision you need to make, the documents available and any required submission date. Identify whether you need an MHI risk assessment, HAZOP or HAZID facilitation, consequence modelling, an emergency plan, training or another service. Different tasks require different expertise and approval.
For an MHI risk assessment, regulation 10 assigns the assessment to an AIA. The Department of Employment and Labour's publications page links an MHI AIA list dated October 2025, as checked on 3 November 2026. Confirm the AIA's current approval and scope directly with the Department. A general consultant, an engineering registration or an accreditation listing alone does not establish that the provider is approved for your MHI assessment.
2. Verify credentials that matter to the work
Ask for the named project lead and the people who will perform or review the work. Verify professional registrations with the relevant body. For engineering registrations, ECSA provides information about its digital certification and live status. For an MHI risk assessment, verify the AIA and the activity scope with the Department.
For other process-safety work, ask for relevant training, experience and work examples that the provider is allowed to share. Membership in a professional association or a course certificate can be useful evidence, but it does not by itself prove competence for every assignment. Avoid imposing one qualification as a universal requirement when the task, applicable law or professional scope does not require it.
3. Compare proposals on the same basis
| Proposal question | What to confirm |
|---|---|
| Scope | Activities included, site visits, workshops, modelling and excluded work. |
| Team | Named lead, discipline mix, reviewer, subcontractors and each person's role. |
| Inputs | Drawings, inventories, operating data, procedures and access the client must provide. |
| Method | Applicable requirements, study method, assumptions, limitations and review stages. |
| Deliverables | Reports, action records, presentations, editable files and approval responsibilities. |
| Schedule | Milestones and dependencies, including data, access, client review and regulator steps. |
| Price | Fee basis, included expenses, scope changes and separately priced follow-up. |
| Aftercare | How findings are explained, corrected for factual errors and handed over for action. |
| Request proposals against the same scope. Compare fee and timeline only after checking what each provider includes and what assumptions could change them. This guide has no verified market pricing or delivery-time dataset, so it does not give an average rate or promise a completion time. |
4. Ask for evidence without requesting confidential material
Ask how the proposed team has handled work with similar hazards, process complexity or regulatory requirements. A provider can explain relevant experience without disclosing another client's confidential information. Request references only where the client has agreed to be contacted. Do not accept an anonymous quotation, project count or success claim as independently verified evidence.
5. Agree the working arrangements
Before appointment, document client inputs, site access, roles, review points, deliverable format, confidentiality, conflicts of interest, change control and sign-off. Ask how the team will handle missing data or disagreement about findings. For regulated work, clarify who is responsible for the submission and which decision remains with the duty holder or regulator.
Questions for a shortlist call
- Which part of our stated scope requires a statutory approval or a specific professional registration?
- Who will lead, perform and review the work?
- What information do you need from us, and what assumptions are included in the proposal?
- What will we receive, and what is outside your scope?
- How will you identify, explain and track recommendations?
- How do schedule and price change if the facility scope or available data changes?
MMRisk offers MHI risk assessment, HAZOP facilitation, QRA and emergency-planning services. If you are considering MMRisk, request a written scope and compare it using the same criteria as any other proposal.
Frequently asked questions
Does every process safety consultant need to be an AIA?
No. Regulation 10 requires an AIA for the MHI risk assessment. Other consulting tasks may have different requirements. Check the assignment and applicable regulation rather than assuming one status covers all work.
How can I check whether an AIA is approved for my work?
Consult the Department's published MHI AIA list and confirm current validity and activity scope directly with the Department. Ask the provider to identify the approval relevant to your establishment and assessment.
Must I hire a Professional Engineer to facilitate a HAZOP?
This guide cannot give a universal qualification rule for every HAZOP. Define the study scope and verify any legal or professional requirements that apply. Evaluate the proposed facilitator's relevant knowledge, training and experience.
How many quotes should I request?
There is no verified rule that every assignment needs a fixed number of quotes. Obtain enough comparable proposals to make a sound decision, taking account of the work's scale, urgency and procurement requirements.
What should I compare besides price?
Compare the named team, scope, method, assumptions, deliverables, schedule dependencies, exclusions and follow-up. A lower price may cover a different amount of work.