Regulation 10 requires an Approved Inspection Authority to carry out the MHI risk assessment under SANS 1461. Verify the provider’s current MHI approval and scope, then agree the site-specific assessment deliverables in writing.
An Approved Inspection Authority (AIA) is the body that regulation 10 requires a duty holder to engage for the MHI risk assessment under SANS 1461. The provider’s current Department approval and scope must cover the relevant work. An AIA assessment does not certify the Safety Report, issue the high-hazard licence, or guarantee a Department decision.
Updated, 3 November 2026: Replaced the expired licence deadline, fabricated AIA application steps and qualifications, and claims of guaranteed report acceptance with a source-based provider-verification guide.
What an AIA does for MHI work
Regulation 10 requires the duty holder to ensure that an AIA carries out the risk assessment at intervals not exceeding five years or when there is a change in the establishment. The duty holder must consult the relevant health and safety representative or committee, make assessment results available for comment, submit a revised report within 60 days when it is reviewed or revised without an establishment change, and keep the latest report on site.
Other documents remain the duty holder’s responsibility. For a high-hazard establishment, regulation 12 requires a site-specific Safety Report, while regulation 13 requires a licence application. The Regulations do not say that an AIA “certifies” the Safety Report or makes the licence decision.
Verify a provider before appointment
The Department’s published MHI AIA list available for this review is dated October 2025. Ask the Department whether it has published a later list, then confirm the provider’s name, current approval status, scope, and any conditions against the latest official record. Check the provider’s SANAS accreditation certificate and scope where applicable. The Department approval and SANAS accreditation are distinct records; verify each that applies to the proposed work.
Ask the AIA to state in writing:
- the exact establishment, substances, processes, and locations included in its proposed scope;
- the site information and maximum-inventory data it needs;
- the assessment activities and methods, including consultation and site verification arrangements;
- deliverables, assumptions, exclusions, review steps, and the authorities to which the duty holder must submit the report;
- fees, milestones, and what could change the scope or timing.
Do not assume a provider’s general engineering credentials, SANAS accreditation, or experience alone establish Department approval for a particular MHI scope. Do not treat a directory entry as a guarantee of technical fit for the site.
Compare proposals on scope and evidence
When comparing quotations, align the assessment boundary, input assumptions, deliverables, and exclusions first. Check whether each proposal identifies the relevant regulatory duties, how it will account for the site’s actual inventory and process conditions, how employee consultation is handled, and how uncertainties or recommendations will be recorded.
Avoid comparing only the headline fee. A lower price may omit site work, data development, consequence assessment, or follow-up deliverables; a longer proposal is not automatically better. Ask each provider to explain its own scope rather than using an unsupported universal checklist of required software, professional titles, insurance levels, or company systems.
If an assessment or submission is late
The existing-establishment MHI transition periods have elapsed. An AIA can help perform the required technical assessment and explain its findings, but it cannot waive a deadline, validate an incomplete licence application by signature, or promise a response from the Department. Confirm an outstanding submission route directly with the Department and retain the written reply and proof of delivery.
For site classification, a Safety Report, or a Department notice, request advice that uses the current site information and actual correspondence. A general AIA directory or blog post cannot determine the legal status of a particular establishment.
Frequently asked questions
Must an MHI risk assessment be carried out by an AIA?
Yes. Regulation 10 requires the duty holder to ensure that an AIA carries out the assessment in accordance with SANS 1461, at intervals not exceeding five years or when there is a change in the establishment.
Does an AIA certify a Safety Report or issue an MHI licence?
No such role is stated in regulations 12 and 13. The duty holder prepares the high-hazard Safety Report and applies for the licence; the Chief Inspector makes the licensing decision under regulation 13.
How do I check an AIA’s scope?
Compare the provider’s current Department approval and scope with the proposed assessment. Check current SANAS accreditation scope where applicable and ask the Department if the available list may be outdated. The linked Department AIA register is dated October 2025.
Does engaging an AIA guarantee that the Department will accept an application?
No. An AIA performs the required risk assessment within its scope. It cannot guarantee a separate Department submission or licensing outcome.
Sources
- Major Hazard Installation Regulations, 2022, regulations 10, 12 and 13
- Department MHI Approved Inspection Authorities list, October 2025
- SANAS Conformity Assessment Bodies and accreditation scopes
- Department of Employment and Labour implementation update, 23 March 2026